The project required a remodeling of the exterior facade and a proposal for interior spaces so the house could be reorganized in a functional way. In addition, a proposition of interior design was developed that included the final finishes as well as the furniture of all the spaces. Another important aspect was that all the service networks of the building (electrical installation, gas, and hydraulic) were redesigned. Moreover, green technologies such as rainwater collection, solar heaters, and thermal insulation placement on walls and roofs were installed to make the house more energy-efficient.